Skip to content

findDrawdowns {PerformanceAnalytics}

3 messages · Brian G. Peterson, Costas Vorlow

#
On Tue, 2011-05-10 at 15:48 +0000, Costas Vorlow wrote:
I'm pretty certain this is all spelled out in the documentation.  

From: high water mark
Trough: low point in this drawdown
To: when the initial high water mark is recovered
Depth: drawdown to trough
Length: number of periods of From-To
To Trough: how many periods to the bottom
Recovery: how many periods Trough->end of drawdown

Perhaps you can be specific about what part of the documentation doesn't
make sense to you?